


|
Bridge of the Neckar
|
Project |
Bridge over the Neckar with a junction to the
B10 at Stuttgart-Hedelfingen |
|
Client |
City of Stuttgart |
|
Concept and tender documentation |
Peter und Lochner,
Beratende Ingenieure für Bauwesen GmbH |
|
Description |
Bridge over the Neckar:
5 span prestressed concrete bridge
Der single cell box girder changes in the range of the bank with
smaller spans to a double tee-beam
Construction on falsework and cantilever construction
Length: 231 m
Section width: 10,75 m - 14,25 m
Max. span: 62,50 m
Bridge over the B10:
Portal frame bridge with longitudinal prestressed deck
Total length: 32,00 m
Section width: 20,25 m |
|
Materials |
Concrete B25, B35, B45
Reinforement Steel 500S
Prestressing steel 1570/1770 |
|
Execution |
Working group for the bridges Hafen Süd
Dyckerhoff & Widmann AG, Stuttgart
Baresel AG, Stuttgart
|
|