Retrofitting for a bridge over the Neckar at Neckarrems
as part of the provincial
road #1140.
Client
Province Baden-Württemberg represented by the
government agency for road construction Besigheim
Conceptual design, Call for tender, Structural
design, detailed planning, constr.-supervision
Peter und Lochner,
Beratende Ingenieure für Bauwesen GmbH
Description
- New construction of an approximation slab
with a transition joint on each side of the bridge. Continuous
traffic during the repair.
- Resurfacing
- Refurbishing of the sidewalk cap and of the railing