

 |
Bridge over the Zipfelbach
|
Project |
Bridge over the Zipfelbach as part of the
provincial highway #14,
Winnenden |
|
Client |
Governmental presidium Stuttgart |
|
Conceptual design, tender documentation and structural proofing |
Peter und Lochner,
Beratende Ingenieure für Bauwesen GmbH |
|
Description |
13-span composite bridge with seal-welded steel
box-grider as part of the initial concept. Maximum girder height of
1,60 m. Finally constructed as T-beam section in reinforced /
post-tensioned concrete with variable height. Maximum
section height of 2,20 m.
Dimensions:
- Total length: 465 m
- Maximum width: 28,50 m
- Maximum span: 48 m |
|
Execution |
Construction company Lupp |
|