


|
Hans-Martin-Schleyer Hall
|
Projekt |
Multifunctional center with cycle race track at
Stuttgart, Germany |
|
Client |
City of Stuttgart |
|
Concept design |
Siegel, Wonneberb und Partner
with Peter und Lochner,
Beratende Ingenieure für Bauwesen GmbH |
|
Structural and detailed design
|
Peter und Lochner,
Beratende Ingenieure für Bauwesen GmbH |
|
Description |
Multifunctional center built using steel,
prestressed and reinforced concrete. The steel truss roof
construction is supported by far reaching cantilevers built as
reinforced concrete frames with partial prestressing.
Dimensions:
- Length/Width: 140/100 m - Clear spanned area: 12000m2 -
Length cycle racing track: 285,71 m |
|
Materials |
Concrete B15, B25, B35
Reinforcement st. BSt 420/500, 500/500
Prestressing steel St 1470/1670
Structural steel St 37 |
|
Execution |
Joint venture Paul Stephan, M.F.Wachter |
|