Expansion of the biological treatment bassin, Stuttgart-Mühlhausen,
Germany
|
Project |
Expansion of the biological treatment, 5.
construction stage with 2 bassins for secondary sedimentation, pump
station and distribution building |
|
Client |
Provincial capital Stuttgart |
|
Structural and detailed design |
Peter und Lochner,
Beratende Ingenieure für Bauwesen GmbH |
|
Description |
2 secondary sedimentation bassins with
pump-station and distribution building were built and connected
during full operation to the facility as part of the capacity
increase of the water treatment plant at Mühlhausen.
Dimensions:
Secondary bassin diameter: 50 m
Secondary bassin depth: max. 16 m
Distribution building diameter: 13,40 m
Distribution building Depth: 8,25 m
Pumpstation: 11,85 m x 15,40 m
Pumpstation height: 9,70 m |
|
Materials |
Concrete: B35 WU
Reinforcement steel B St 500/550S
|
|
Execution |
Construction company Gebr. Fahrion |
|