Project |
Decarbonisation facility at the Egau water
plant, Dischingen-Ballmertshofen, Germany |
|
Client |
Zweckverband Landeswasserversorgung |
|
Structural and
detailed design |
Peter und Lochner,
Beratende Ingenieure für Bauwesen GmbH |
|
Description |
Cavern (Cubage 7400 m³) using waterproof
concrete,
Operation building (Cubage 12300 m³) using reinforced concrete and
roof with cable truss laminated beams,
Connecting and acces tunnel
(Cubage 1000 m³) as single reinforced concrete tunnel element. |
|
Material |
Concrete: C35/45
Reinforement steel B St 500/550S
Structural steel S 235JR, S 355JO
Laminated wood BS11 |
|
Structural
execution |
Baufirma Meyer |