


|
Wieslauftal bridge, Schorndorf, Germany 1. Prize
|
Project |
Wieslauftal bridge with access ramps as part of
the state highway B29 at
Schorndorf, Germany |
|
Client |
Regierungspräsidium
Stuttgart |
|
Competition design and design for the tender
documentation |
Peter und Lochner, Beratende
Ingenieure für Bauwesen GmbH
with Frank-Jakob-Bluth,
Freie Architekten BDA |
|
Structural proofing
|
Prof. Dr.-Ing. Jörg Peter |
|
Description |
14 span prestressed (Suspa-strands) reinforced
concrete bridge with access and exit lanes. Superstructure with
longitudinal and lateral prestressing.
Dimensions: - Total length: 340 m - Deck width: 25,5 - 34 m -
Maxiumu span: 46 m |
|
Materials |
Concrete B25, B45
Reinforcement steel BSt 500/550 S
Prestressing steel St 1570/1770 |
|
Execution |
Construction company Aisslinger, Aalen, Germany
|
|